NewsItem11x06x11x0: Difference between revisions
(Created page with " <noautolink> Cleaning the revspace floortiles with a pressure cleaner comes with options. Awesome options. After some initial brainstorming and instant-proof-of-concepts the id...") |
No edit summary |
||
Line 1: | Line 1: | ||
Cleaning the revspace floortiles with a pressure cleaner comes with options. Awesome options. After some initial brainstorming and instant-proof-of-concepts the idea landed; we need a logo at our entrance. Can we fix that instantly? Yes of course! | Cleaning the revspace floortiles with a pressure cleaner comes with options. Awesome options. After some initial brainstorming and instant-proof-of-concepts the idea landed; we need a logo at our entrance. Can we fix that instantly? Yes of course! | ||
Line 8: | Line 5: | ||
Welcome to RevSpace! | Welcome to RevSpace! | ||
http://i.sigio.nl/4e0e110673f836a93b92e4570be8129f.jpg | |||
<br /> | <br /> | ||
First we started with a projector; which Stitch and Ikarus aligned and stabilized matching the side of the Revspace entrance. | First we started with a projector; which Stitch and Ikarus aligned and stabilized matching the side of the Revspace entrance. | ||
http://i.sigio.nl/a88fbcddd496e15dd924a0ada2405246.jpg <BR> | |||
http://i.sigio.nl/df9d2d93c8f9add3bbefe348f8125d7e.jpg | |||
<br /> | <br /> | ||
Next; we use tape. A lot of tape. With two people it took too long, so Juerd and FooBar joined the party. We used up all the tape available in the space, but unfortunately that wasn't enough. GMC rushed home to get more and that worked out. We only had about 20 centimeters of tape left! :) | Next; we use tape. A lot of tape. With two people it took too long, so Juerd and FooBar joined the party. We used up all the tape available in the space, but unfortunately that wasn't enough. GMC rushed home to get more and that worked out. We only had about 20 centimeters of tape left! :) | ||
http://i.sigio.nl/ef450e030578507255899a1b8b95b4d7.jpg <BR> | |||
http://i.sigio.nl/d1f83e5a3c0d7f06deeb94e3894f4369.jpg | |||
<br /> | <br /> | ||
Taping takes about 3 rolls of tape and 2 hours: | Taping takes about 3 rolls of tape and 2 hours: | ||
http://i.sigio.nl/712f954db13afe09277e318ecaacb4be.jpg | |||
<br /> | <br /> | ||
Spot cleaning the tiles with pressurized water only takes about 15 minutes: | Spot cleaning the tiles with pressurized water only takes about 15 minutes: | ||
http://i.sigio.nl/b05dcc7beaaf23105288c1322345e045.jpg | |||
<br /> | <br /> | ||
Final cleaning for dramatic contrast enhancement effect: | Final cleaning for dramatic contrast enhancement effect: | ||
http://i.sigio.nl/1fe31f03ef71cbc80c68fa6691bf71e1.jpg | |||
<br /> | <br /> | ||
Removing the tape: | Removing the tape: | ||
http://i.sigio.nl/87fed54529f88aa3839bbfa450f6c421.jpg | |||
<br /> | <br /> | ||
End Result: WIN! | End Result: WIN! | ||
http://i.sigio.nl/4e0e110673f836a93b92e4570be8129f.jpg | |||
Thanks to Ikarus, Juerd, FooBar, Stitch and GMC. | Thanks to Ikarus, Juerd, FooBar, Stitch and GMC. | ||
Latest revision as of 11:24, 6 November 2011
Cleaning the revspace floortiles with a pressure cleaner comes with options. Awesome options. After some initial brainstorming and instant-proof-of-concepts the idea landed; we need a logo at our entrance. Can we fix that instantly? Yes of course!
It turned out to be easy; within 3 hours of work we realized a life-size RevSpace logo. Check it out and apply it to wherever whenever: its easy and it rocks.
Welcome to RevSpace!
http://i.sigio.nl/4e0e110673f836a93b92e4570be8129f.jpg
First we started with a projector; which Stitch and Ikarus aligned and stabilized matching the side of the Revspace entrance.
http://i.sigio.nl/a88fbcddd496e15dd924a0ada2405246.jpg
http://i.sigio.nl/df9d2d93c8f9add3bbefe348f8125d7e.jpg
Next; we use tape. A lot of tape. With two people it took too long, so Juerd and FooBar joined the party. We used up all the tape available in the space, but unfortunately that wasn't enough. GMC rushed home to get more and that worked out. We only had about 20 centimeters of tape left! :)
http://i.sigio.nl/ef450e030578507255899a1b8b95b4d7.jpg
http://i.sigio.nl/d1f83e5a3c0d7f06deeb94e3894f4369.jpg
Taping takes about 3 rolls of tape and 2 hours:
http://i.sigio.nl/712f954db13afe09277e318ecaacb4be.jpg
Spot cleaning the tiles with pressurized water only takes about 15 minutes:
http://i.sigio.nl/b05dcc7beaaf23105288c1322345e045.jpg
Final cleaning for dramatic contrast enhancement effect:
http://i.sigio.nl/1fe31f03ef71cbc80c68fa6691bf71e1.jpg
Removing the tape:
http://i.sigio.nl/87fed54529f88aa3839bbfa450f6c421.jpg
End Result: WIN!
http://i.sigio.nl/4e0e110673f836a93b92e4570be8129f.jpg
Thanks to Ikarus, Juerd, FooBar, Stitch and GMC.