RevSpace1:Infrastructure: Difference between revisions

From RevSpace
Jump to navigation Jump to search
No edit summary
Line 7: Line 7:
Since 2012/02/15, there are calori-meters on all the heating units. Please try to minimize use of the central heating, as our gas-bill is enormous.
Since 2012/02/15, there are calori-meters on all the heating units. Please try to minimize use of the central heating, as our gas-bill is enormous.


This is a list of the sensor-numbers (and their readings).
This is a list of the sensor-numbers (and their readings), Going clockwise through the space.


=== Workshop ===
{|
 
!Room
* 7331
!Sensor#
* 7334
!2012/02
* 7377
|-
 
|Workshop
=== Toilet ===
|7377
 
|0
* 7378
|-
 
|Workshop
=== Storage behind serverroom ===
|7334
 
|0
* 7382
|-
* 7330
|Workshop
 
|7331
=== Studio ===
|0
 
|-
* 7365
|Toilet
 
|7378
=== Hacklab ===
|0
 
|-
* 7370
|Storage
* 7329
|7383
* 7369
|0
 
|-
=== Lounge ===
|Storage
 
|7330
* 0283
|0
* 0279
|-
* 0337
|Studio
* 0328
|7365
* 0297
|0
* 0163
|-
* 0296
|Hacklab
 
|7370
=== Room 101 ===
|0
 
|-
* 0278
|Hacklab
 
|7329
=== Kitchen ===
|0
 
|-
* 0241
|Hacklab
 
|7369
=== Arcade ===
|0
 
|-
* 0246
|Lounge
|0283
|0
|-
|Lounge
|0279
|0
|-
|Lounge
|0337
|0
|-
|Lounge
|0328
|0
|-
|Lounge
|0297
|0
|-
|Lounge
|0163
|0
|-
|Lounge
|0296
|0
|-
|Room101
|0278
|0
|-
|Kitchen
|0241
|0
|-
|Arcade
|0246
|0
|}

Revision as of 11:47, 15 February 2012

Network

Power

Heating

Since 2012/02/15, there are calori-meters on all the heating units. Please try to minimize use of the central heating, as our gas-bill is enormous.

This is a list of the sensor-numbers (and their readings), Going clockwise through the space.

Room Sensor# 2012/02
Workshop 7377 0
Workshop 7334 0
Workshop 7331 0
Toilet 7378 0
Storage 7383 0
Storage 7330 0
Studio 7365 0
Hacklab 7370 0
Hacklab 7329 0
Hacklab 7369 0
Lounge 0283 0
Lounge 0279 0
Lounge 0337 0
Lounge 0328 0
Lounge 0297 0
Lounge 0163 0
Lounge 0296 0
Room101 0278 0
Kitchen 0241 0
Arcade 0246 0